SCS Testing product compliance service image
Product compliance testing and certification support

Support for wireless devices subject to the FCC Certification procedure, including rule scoping, RF and exposure testing, application exhibits, TCB review coordination and FCC ID labelling checks.

Service overview

An FCC ID identifies equipment authorized under the FCC Certification procedure and combines the grantee code with an applicant-selected product code. SCS Testing supports testing and preparation of application exhibits, while the applicant remains responsible for grantee information and continued conformity of production units. This service is managed separately from general SDoC testing.

Applicable products or businesses

  • Wi-Fi, Bluetooth, cellular, LoRa, Zigbee and other intentional radiators
  • Host products using new antennas, changed RF parameters or integrations outside module grant conditions
  • Devices requiring a new application, change-in-identification review or permissive-change assessment

Target market

  • U.S. radiofrequency-device market

Regulatory authority

  • U.S. Federal Communications Commission
  • A recognized Telecommunication Certification Body

Regulations, directives and standards

  • 47 CFR Part 2, Subpart J equipment-authorization procedures
  • Part 15, 22, 24, 27 or another rule part applicable to the device
  • FCC KDB procedures, RF-exposure, labelling and application-exhibit requirements

Service scope

  • Application type, rule-part and FCC ID structure confirmation
  • RF, EMC and RF-exposure testing or evaluation
  • Preparation of exhibits such as block diagrams, operational descriptions, photographs and user manuals
  • TCB response support, grant-condition review and label verification

Service process

  • Confirm the applicant, grantee code, device category and model scope
  • Complete the technical assessment and freeze hardware, software, antennas and test modes
  • Perform testing and prepare reports and application exhibits
  • Submit through a TCB and respond to technical review questions
  • Verify grant information, FCC ID labelling and production-conformity controls

Information required

  • Applicant and grantee-code information
  • Specifications, schematics, block diagram, PCB information and component list
  • Antenna, modulation, power, band and software-control descriptions
  • Internal/external photographs, label location and user manual
  • Confidentiality requests, authorization letters and existing FCC records where applicable

Sample requirements

  • Engineering samples capable of stable operation in all maximum-power modes
  • Required RF interfaces, test cables, control software and companion equipment
  • Sample configuration must match the application exhibits and intended production version

## Reports, certificates or registration outcomes Following successful TCB review, the project may receive an equipment-authorization grant and a corresponding FCC ID record. The result is not a general approval of all products made by the company and does not replace grant conditions, change-control obligations or production conformity.

Factors affecting timing

Timing depends on band and technology complexity, RF-exposure method, exhibit completeness, corrective testing and TCB questions. Change-in-identification and permissive-change projects require an eligibility review first.

Common compliance risks

  • Incorrect applicant, grantee code or FCC ID construction
  • Application exhibits do not match the tested sample
  • Antenna, power, software or enclosure changes are made without authorization-impact review
  • FCC ID authorization is presented as broad approval of product quality or safety

Who holds an FCC ID?

The FCC ID is associated with the equipment-authorization grantee, which must be able to accept responsibility for continued conformity.

## Can identical equipment be sold under multiple brands?

Device identity, grant records and labelling rules must be reviewed; a brand change does not remove grant conditions.

## Can the antenna be changed after authorization?

Only within the grant conditions and applicable change procedures. An unreviewed antenna change may invalidate the authorization basis.

Related services

  • FCC SDoC and EMC testing
  • RF-exposure assessment
  • CE radio-equipment compliance
  • Radio-module integration review

Information for an initial assessment

Provide the product name, model, intended use, target market, bill of materials and available reports so that the applicable route and evidence gaps can be assessed.

Your questions, answered clearly

Prepare the product name, model, product photos or links, intended use, target market, sales platform requirements and any existing reports or certificates

No. Requirements and results depend on product details, applicable standards, test data and review by the relevant laboratory, certification body or platform

Send the product information and target market requirements first. The team can then help confirm the document checklist, possible test scope and communication workflow